The ice cream production lab is nearly ready, last Sunday our eleven years daughter helped with the ceiling painting
In a couple of day ice cream making machine will arrive, first on site ice cream making trials will finally take place!
Monday, April 20, 2009
Monday, April 13, 2009
our architect and carpenter visit (08.04.2009)
Paolo the architect (on the left) and Eugenio the carpenter (on the right) enjoyed a sunny day in Marbella with us.
Measures and colors are now defined and checked!
Measures and colors are now defined and checked!
Tuesday, April 7, 2009
Men at work!
'Las Obras' (refurbishment works) have begun!
Production room floor has been removed, to be replaced by a waterproof one, sporting a sinkhole.
This will allow perfect cleaning and hygiene after ice cream production.
Walls are being tiled up to the ceiling, again to guarantee hygiene and easy cleaning
A couple of pipes cross the entire shop floor to allow reusing water used to cool down the machines and ice cream counter:first pipe receives hot water from machines and counters; Water is cooled by a water chiller Chiller sends back cooled water to machines and counter via second water pipe.
In short: It's really thrilling to see how our project is progressing, even though there's still loads to do
Talk to you soon :-)
Production room floor has been removed, to be replaced by a waterproof one, sporting a sinkhole.
This will allow perfect cleaning and hygiene after ice cream production.
Walls are being tiled up to the ceiling, again to guarantee hygiene and easy cleaning
A couple of pipes cross the entire shop floor to allow reusing water used to cool down the machines and ice cream counter:
In short: It's really thrilling to see how our project is progressing, even though there's still loads to do
Talk to you soon :-)